Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#18836 Archived
GOLDEN STATE BRIDGE, INC logo

GOLDEN STATE BRIDGE, INC

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Reference
C09001
Project
Geysers Road Bridge over Big Sulphur Creek Replacement Project
Location
Geysers Road Bridge
Owner
Sonoma County Public Infrastructure
Bid Date
03/06/2024 at 02:00PM

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

 

Sub Trades needed, but not limited to:  LEAD COMPLIANCE  PLAN, PROGRESS SCHEDULE (CRITICAL PATH METHOD), DISPUTE RESOLUTION ADVISOR ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION- ADVISOR-RELATED TASKS, DEVELOP WATER SUPPLY, CONSTRUCTION  AREA SIGNS, TRAFFIC CONTROL SYSTEM, FLAGGING, TEMPORARY PAVEMENT MARKING (TAPE), PORTABLE DELINEATOR, PORTABLE SIGNAL SYSTEMS (EA), PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY  RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY  FIBER ROLLS, TEMPORARY CONSTRUCTION  ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE  WASHOUT, ·   WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING  REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, WORK AREA MONITORING (BRIDGE), TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST (LS), INVASIVE SPECIES CONTROL, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY  EXCAVATION, STRUCTURE EXCAVATION (BRIDGE), STRUCTURE EXCAVATION (TYPED), STRUCTURE EXCAVATION (RETAINING WALL), STRUCTURE BACKFILL (BRIDGE), STRUCTURE BACKFILL (RETAINING WALL), BIORETENTION  SOIL MEDIA, PLANT ESTABLISHMENT  WORK (3 YEAR), DECOMPOSED  GRANITE, ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, CLASS 2 AGGREGATE BASE (CY), ASPHALT CONCRETE (TYPE A, 1/2" MAX, PG 64-16), PLACE ASPHALT CONCRETE DIKE (TYPE F), REMOVE BASE AND SURFACING, EARTH RETAINING STRUCTURE (MGS), 96" PERMANENT STEEL CASING, 24" CAST-IN-DRILLED-HOLE CONCRETE PILING, 84" CAST-IN-DRILLED-HOLE CONCRETE PILING, 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (RETAINING  WALL), PRESTRESSING CAST-IN-PLACE  CONCRETE, STRUCTURAL  CONCRETE, BRIDGE FOOTING, STRUCTURAL  CONCRETE, BRIDGE, STRUCTURAL  CONCRETE, BRIDGE (POLYMER FIBER), STRUCTURAL  CONCRETE, RETAINING WALL, STRUCTURAL  CONCRETE, APPROACH SLAB (TYPE EQ), STRUCTURAL  CONCRETE, HEADWALL, STRUCTURAL  CONCRETE,  DRAINAGE INLET, JOINT SEAL (MR 2"), BAR REINFORCING  STEEL (BRIDGE), BAR REINFORCING  STEEL (RETAINING WALL), EXISTING BRIDGE REPAIR, ACCESS OPENING, SOFFIT, BRIDGE REMOVAL (PORTION), 18" CORRUGATED  STEEL PIPE (.064" THICK), 18" CORRUGATED  STEEL PIPE (.109" THICK), 24" CORRUGATED  STEEL PIPE (.064" THICK), 24" CORRUGATED  STEEL PIPE (.109" THICK), 48" CORRUGATED  STEEL PIPE (.168" THICK), 6" PERFORATED STEEL PIPE UNDERDRAIN (.064" THICK)', CLASS 2 PERMEABLE  MATERIAL (BLANKET), 18" ANCHOR ASSEMBLY, 24" ANCHOR ASSEMBLY, 36" CORRUGATED STEEL PIPE INLET (.138" THICK), WELDED STEEL PIPE CASING (BRIDGE), REMOVE CULVERT (LF), GRAVEL FILTER, ROCK SLOPE PROTECTION (1/2T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION  (l/4T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION  (150 LB, CLASS III, METHOD B)(CY), ROCK SLOPE PROTECTION  (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION  (1T, CLASS VIII, METHODB), ROCK SLOPE PROTECTION  FABRIC (CLASS 8), MISCELLANEOUS IRON AND STEEL, BRIDGE DECK DRAINAGE SYSTEM, SURVEY MONUMENT (TYPE A), CHAIN LINK FENCE (TYPE CL-8), 6'CHAIN LINK GATE (TYPE CL-8), REMOVE GATE, GUARD RAILING DELINEA TOR, PAVEMENT MARKER (RETROREFLECTIVE), OBJECT MARKER (TYPE P), OBJECT MARKER (TYPE L-1), REMOVE ROADSIDE SIGN, RELOCATE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM  SIGN (0.063"-UNFRAMED), ROADSIDE SIGN - ONE POST, MIDWEST GUARDRAIL SYSTEM (STEEL POST), TRANSITION  RAILING (TYPE WB-31), END ANCHOR ASSEMBLY  (TYPE SF-M), ALTERNATIVE  IN-LINE TERMINAL  SYSTEM (TL-2), CALIFORNIA  ST-75 BRIDGE RAIL, REMOVE GUARDRAIL, THERMOPLASTIC  TRAFFIC STRIPE, MOBILIZATION

 

 

                                                      ALL ITEMS CAN BE BID IN FULL OR PARTIAL QUANTITIES.

Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project.

 

If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001.  Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000.

 

Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects.  Registration with The D.I.R. costs $400 and covers the fiscal year (July 1 to June 30th).  To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html

 

We are an Equal Opportunity Employer

Bid Documents

Bid documents can be viewed at or obtained from:

Plans for this project are available for review at the office of Golden State Bridge, Inc. 3701 Mallard Drive, Benicia, CA 94510 between the hours of 8:00 and 5:00 pm.  If you would like the Plans and Specs emailed, please send your request to David Riccitiello at [email protected].  Plans and Specifications can also be reviewed at Sonoma Co Public Infrastructure 2300 County Center Dr, Suite A220, Santa Rosa CA


P

Contact

GOLDEN STATE BRIDGE, INC

3701 MALLARD DRIVE
BENICIA, CA 94510

Published 2/08/2024 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208