Buhler Commercial
An Equal Opportunity Employer is requesting quotations from all qualified DVBE sub-contractors and/or material suppliers for the following project:
- Reference
- 12275
- Project
- Galileo Academy of Science and Technology Bleacher Building Repair, San Francisco, CA
- Owner
- San Francisco Unified School District (SFUSD) CA
- Bid Date
- 03/12/2024 at 02:00pm
Scope / Description
We are requesting bids for the following trades and/or material suppliers:
Bid Documents
Bid documents can be viewed at or obtained from:
RFP: Galileo Academy of Science Bleacher Building Repair Project
Scope:
Structural repairs to an existing bleacher building in conjunction with waterproofing repairs of its sloped concrete deck, including but not limited to:
a. patch and repair work of spalled and cracked sloped concrete deck under bleacher seating;
b. removal of existing wood bleacher seating and its replacement with new aluminum bleacher planks,
c. removal of existing waterproofing membrane and its replacement with new waterproofing assembly over existing sloped concrete deck;
d. interior alterations at underside of sloped concrete deck affecting fire sprinkler, fire alarm, lighting, electrical power, mechanical, and plumbing systems;
e. removal of existing door frames and doors and their replacement with new hollow metal door frames and FRP clad doors
f. miscellaneous painting
g. abatement of hazardous materials
Duration:
Construction Schedule: Anticipated completion date: March 2025.
· Buhler Commercial is signatory the Carpenters and Labors Union.
- This is a Prevailing wage project.
- All subcontractors must be register with the DIR.
- When submitting a bid proposal be sure to acknowledge the projects bid documents (Drawing, Specifications, Addenda, ETC).
- All subcontractors are response for their own parking.
- Buhler Commercial requires subcontractors awarded on this project to provide Payment and Performance Bonds from a surety at the subcontractor’s expense for any contract that exceed $300,000.
Please reach out to:
Antonio Ruiz
General Engineering Division Manager
Office: (415) 610-8650
Mobile: (510) 938-3033
Contact
Buhler Commercial
400 Brannan Street
San Francisco,
Cali 94107
- 4156108650
- [email protected]
- Antonio Ruiz
Published 3/07/2024 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com
Phone: (888) 988-1208