Serafix Engineering Contractors, In
An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:
- Reference
- 04-0Q2104, Fed #ACIM-0801(996)E
- Project
- 04-0Q2104 Install Gross Solids Removal Devices and Trash Nets
- Location
- For Construction on State Highway In Contra Costa County at Various Locations from Central Avenue Undercrossing to Willow Avenue Undercrossing
- Owner
- Caltrans Headquarters Sacramento (CADOT) CA
- Bid Date
- 07/18/2024 at 02:00pm
Scope / Description
We are requesting bids for the following trades and/or material suppliers:
Serafix Engineering Contractors, Inc. (SEC) is soliciting quotes from certified DBE Subcontractors and Suppliers for the following categories of work (including but not limited to): LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DRA ON-SITE MEETING, OFF-SITE DRA, CAS, TRAFFIC CONTROL SYSTEM, CHANNELIZER (SURFACE MOUNTED), TEMP BARRIER SYSTEM, PCMS, TEMP CRASH CUSHION TL-3, SWPPP, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, TREATED WOOD WASTE, ROADWAY EXC, ROADWAY EXC (TYPE Z-2) (AERIALLY DEPOSITED LEAD), SHOULDER BACKING, DITCH EXCAVATION, SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP A), PLANT (GROUP B), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, CHECK AND TEST EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, SALVAGE IRRIGATION FACILITY, 1" REMOTE CONTROL VALVE, 1 1/4" REMOTE CONTROL VALVE,1 1/2" REMOTE CONTROL VALVE, 1" WYE STRAINER ASSEMBLY, 1 1/4" WYE STRAINER ASSEMBLY, 1 1/2" WYE STRAINER ASSEMBLY, 2" WYE STRAINER ASSEMBLY, RISER SPRINKLER ASSEMBLY, 2" GATE VALVE, (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2 1/2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), (F) - 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), QUICK COUPLING VALVE, MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST (CY), INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE (CY), PRIME COAT, HMA, PLACE HMA (MISC AREA), (F) - STRUCTURAL CONCRETE, DRAINAGE INLET, GROSS SOLIDS REMOVAL DEVICE INCLINED SCREEN TYPE A AND TYPE D, GROSS SOLIDS REMOVAL DEVICE LINEAR RADIAL TYPE LR-2 (6), TYPE LR-2 (8), TYPE LR-4 (4),TYPE LR-3 (6), TYPE LR-3 (8), TYPE LR-4 (6), TYPE LR-4 (8), TYPE LR-5 (6), TYPE LR-5 (8),TRASH NET (OPEN CHANNEL), 18" REINFORCED CONCRETE PIPE, 24" REINFORCED CONCRETE PIPE, ABANDON PIPELINE, MODIFY INLET, MISC IRON AND STEEL, CHAIN LINK FENCE (TYPE CL-6), 10' CHAIN LINK GATE (TYPE CL-6), 12' CHAIN LINK GATE (TYPE CL-6), REMOVE CHAIN LINK FENCE, RECONSTRUCT CHAIN LINK FENCE, TREATMENT BEST MANAGEMENT PRACTICE MARKER, OBJECT MARKER (TYPE P), REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED), ROADSIDE SIGN - TWO POST, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION. Work will be broken down to accommodate subcontractor quotes.
PLEASE SUBMIT A COPY OF YOUR CURRENT DBE CERTIFICATION WITH YOUR PROPOSAL.
SEC adheres to the requirement for Affirmative Action to ensure Equal Employment Opportunity according to Executive Order 11246, and requires proof from all subcontractors that they are in accordance. 100% Performance and Payment Bonds with a surety company thereof, subject to the approval of SEC, will be required of all subcontractors.
SEC will pay bond premium up to 1.5%. Please contact SEC for assistance with bonding, insurance, or lines of credit. All subcontractors are expected to sign a standard contract, which can be viewed at our location. Any bid provided by a Subcontractor constitutes an acceptance on each and every term of the general contractor’s standard contract. Subcontractor will be deemed to understand and accept those terms by providing a bid. Any attempt by a Subcontractor to revise or limit those terms will be null and void and not recognized by SEC. Prevailing wages must be met. Subcontractor must possess current insurance and workers compensation coverage meeting SEC’s insurance requirements. Insurance waiver of subrogation is also required. SEC is a Union Contractor. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreementsBid Documents
Bid documents can be viewed at or obtained from:
Contact
Serafix Engineering Contractors, In
7 Crow Canyon Ct., Ste 250
San Ramon,
CA 94583
- 925-552-8253
- [email protected]
- Larry Brandt
Published 7/03/2024 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com
Phone: (888) 988-1208