Stacy and Witbeck, Inc.
An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:
- Reference
- 2023-28
- Project
- Fairfax Bolinas Road MP 1.00 Retaining Wall & Existing Wall Repair, Marin County, CA
- Location
- Marin, Marin County, CA
- Owner
- County of Marin CA
- Bid Date
- 08/05/2024 at 12:00pm
Scope / Description
We are requesting bids for the following trades and/or material suppliers:
CIDH Drilling/Piles
Ground Anchor Drilling
Rebar
Signing & Striping
Guardrail
Asphalt Grinding & Paving
Traffic Control Flagging
Suppliers:
Concrete
Aggregates
Storm Drain Materials
Temporary Concrete Barrier
Erosion Control Materials
https://stacywitbeck.box.com/s/nmoqlgl7db2hmpjvgzcj5qfe464o1cfa
The project generally consists of the construction of a 100-foot-long CIDH retaining wall, a 100-foot-long concrete waler and the installation of horizontal ground anchors in both. Construction will include the following work activities: structural concrete, minor concrete, shoring, temporary structures, earthwork, pier drilling, erosion and sediment control, roadway paving, striping, a new drainage system, traffic control, guardrail installation, and rock slope protection.
All subcontractors must possess a current contractor’s license, insurance, and worker’s compensation insurance coverage meeting Stacy and Witbeck’s requirements. A copy of the insurance requirements and agreements can be obtained by contacting the estimator. In addition, subcontractors are required to register with the Department of Industrial Relations (DIR), as required by Public Contract Code Section 1725.5, please furnish DIR number with your quote submittal. Include applicable DBE certifications issued and validated by pertinent agencies. Stacy and Witbeck, Inc. is an Affirmative Action/EEO company and is willing to assist qualified certified DBE and other small business certified firms to achieve our subcontractor/supplier goals. Subcontractors will be required to provide a 100% performance and a 100% payment bond for the full amount of the subcontract price. Items of work may be broken down into an economically feasible package to encourage participation. Please also provide bond rates with your submitted bids. In some cases, we may be able to provide assistance obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials, as well as any related assistance in services to subcontractors who may otherwise be at a disadvantage. Please be advised of the Agency Specific Provisions 11.1 EPA Requirements and 11.2 California State Revolving Fund (CASRF) Requirements.
Bid Documents
Bid documents can be viewed at or obtained from:
Contact
Stacy and Witbeck, Inc.
2800 Harbor Bay Parkway
Alameda,
CA 94502
- (510) 748-1870
- [email protected]
- Matt Johnson
Published 7/23/2024 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com
Phone: (888) 988-1208