Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#19335 Archived
George Reed, Inc. logo

George Reed, Inc.

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Reference
Contract #03-4H8704
Project
Caltrans, Contract #03-4H8704, Construction on State Highway in Sutter County near Yuba City from 0.6 Mile South to 0.6 Mile North of Oswald Road, #03-Sut-99-25.0/26.2, F.A.P. #ACHSNH-P099(686)E
Location
Sutter County
Owner
CalTrans
Bid Date
08/28/2024 at 02:00pm

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

Seeking All DBE Subcontractors/Suppliers needed for, including but not limited to: CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM/TRAFFIC FLAGGERS, TEMPORARY RAILING (TYPE K); DEVELOP WATER SUPPLY; ROADWAY EXCAVATION; HYDROSEEDING; EROSION CONTROL; TEMPORARY EROSION CONTROL; PORTLAND CEMENT & CONCRETE PAVEMENT; CONCRETE STRUCTURE; MINOR CONCRETE STRUCTURE; SIGN STRUCTURE; ROADSIDE SIGN; REINFORCED CONCRETE PIPE; PLASTIC PIPE; CONCRETE CURB & SIDEWALK-MISC.; SAWCUTTING; CRASH CUSHION; THERMOPLASTIC TRAFFIC STRIPING & MARKING; PAVEMENT MARKER; SIGNAL & LIGHTING; MESSAGE SIGNS, LIGHTING, & SIGN ILLUMINATION; TRAFFIC COUNT STATION; ENVIRONMENTAL–BIOLOGICAL STUDIES; CONSTRUCTION SCHEDULING; LEAD COMPLIANCE; TRUCKING; WATER TRUCK; STREET SWEEPING TRUCK; OIL ASPHALT SUPPLIER/ASPHALT OIL TANKER; RUMBLE STRIPS; or any item of work or material you are qualified to perform or furnish.  NON-DBE SUBS/SUPPLIERS:  You will be expected to carry a proportionate percentage of 2nd-tier DBE participation with your quote.  Second-tier DBE participation will be evaluated with your price.
GEORGE REED, INC. is signatory to Operating Engineers, Laborers, and Cement Masons Unions.    100% Performance and Payment Bonds may be required for the full amount of subcontract price.    GEORGE REED, INC. will pay bond premiums of up to 2%. The subcontractor must possess current insurance and workers compensation coverage meeting Owner’s and GRI’s insurance requirements. Insurance waiver of subrogation is also required. Please call if you need assistance with bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials, or any related services; or assistance with breaking down items into economically feasible units or establishing flexible time frames for performance and delivery schedules to encourage or facilitate your participation. GEORGE REED, INC. is an Equal Opportunity Employer

Bid Documents

Bid documents can be viewed at or obtained from:

Plans and specifications may be viewed in our office, at your local Builders Exchange, or at the Caltrans Website at:  http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php

Contact

George Reed, Inc.

P.O. Box 4760
Modesto, CA 95352

Published 7/30/2024 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208