Steve P. Rados, Inc.
An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:
- Reference
- 12-02, Fed #BRLS-5282(042)
- Project
- *New Bid Date* South Palm Canyon Drive Bridge Replacement at Tahquitz Creek Channel, Palm Springs, CA
- Location
- Palm Springs
- Owner
- City of Palm Springs CA
- Bid Date
- 08/19/2024 at 03:00pm
Scope / Description
We are requesting bids for the following trades and/or material suppliers:
Sand & Gravel
Supplier, Base, Rock, Cobbles, Boulders Supplier, Pipe Supplier, Construction
Area Signs, Traffic Control System, Temporary Railing Type K, Plane Asphalt
Concrete, Remove Concrete, Clearing & Grubbing, Roadway Excavation, Planting/Landscaping,
Irrigation System, Temporary Erosion Control, Pipeline, Drain Inspection &
Cleaning, Aggregate Base, Concrete Pumping, Asphalt Concrete Paving, Pre-stressing
Concrete Cast-In-Place, Concrete Structure, Minor Concrete Structure, Reinforcing
Steel, Reinforced Concrete Pipe, Welded Steel Pipe, Welding Contractor, Rock
Slope Protection, Concrete Curb/Gutter/Sidewalk/Ramp-Misc, Fencing, Metal
Railing, Concrete Barrier, Metal Beam Barrier, Pavement Marking & Striping,
Materials Testing Services, Inspection Services, SWPPP Planning, Super 10 Dump
Truck, Water Truck, Street Sweeping Truck, Demolition
NAICS:
212319, 212321, 237110, 237310, 238110, 238120, 238190, 238910, 238990, 327390, 423510, 484220, 488490, 541330, 541380, 541990, 561730
S.P. Rados, Inc. is a Signatory Union Contractor. Subcontractors will be required to abide by the terms and conditions of the AGC Standard Long Form Subcontract incorporating prime contract terms and conditions, including payment provisions & insurance requirements. S.P. Rados, Inc.’s listing of a subcontractor is not to be construed as an acceptance of all the subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Subcontractors will be required to provide a payment & performance bond from an approved surety company for 100% of the subcontracted work. S.P. Rados, Inc. will pay bond premium up to 1.5% (optional).
Please be advised, Contractors and Subcontractors must register with the D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with the D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify status of your D.I.R. number, please visit: http://.dir.ca.gov/Public-Works/Contractors.html.
Assistance is available in obtaining bonds, lines of credit and/or insurance. We will consider dividing total requirements when economically feasible into smaller tasks or quantities to permit participation by DBE's in the competitive process. We will assist in obtaining necessary equipment, supplies, materials & related assistance or services. S.P. Rados, Inc. requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.
Plans and Specifications are available free of charge at: https://stevepradosinc.sharefile.com/d-s40e8088e0a0f4b758b0540899a17bda8
And also available for viewing at 2002 E. McFadden Ave., Ste. 200, Santa Ana, CA 92705 call our office to schedule a review of the plans and specifications (714) 835-4612.
Bid Documents
Bid documents can be viewed at or obtained from:
Contact
Steve P. Rados, Inc.
2002 E McFadden Ave., Ste. 200
Santa Ana,
CA 92705
- (717) 835-4612
- [email protected]
- Noe Guerrero
Published 8/08/2024 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com
Phone: (888) 988-1208