Project Description: Work: Remove and dispose of four (4) existing sluice gates and associated appurtenances from inside existing secondary clarifiers flow splitter box; install Owner furnished, four (4) new sluice gates and associated appurtenances to replace existing. Work includes furnish, installation, and operation of temporary pumping and piping system to bypass up to 50 MGD of flow going to the splitter box with discharge directed to the center of four (4) existing 145 foot diameter secondary clarifiers; furnish and installation of temporary pipe plugs and one (1) permanent plug to isolate flow from entering and leaving the splitter box as necessary for work on sluice gates; draining the splitter box by pumping as necessary for work on sluice gates; and furnish and installation of temporary diesel powered engines for operation of bypass pumps.
Prebid: A mandatory pre-bid meeting will be held on September 25th, 2024, 2:00 PM (MT) at the Haskell WWTP - IWQL Classroom, International Lab at 4100-L Delta Drive, El Paso Texas 79905. A job walk will follow. Job walk attendees will be required to bring PPE & Identification to gain access to the site.
Questions should be in writing and directed to Pablo Bram at [email protected]. All questions, clarifications, or coordination issues must be in writing and reference the appropriate detail(s) and/or the specification section and paragraph no later than Fifteen (15) business days before the bid date. Bidders shall not contact the Owner, Architect, or Engineers directly.
PCL/Sundt JV celebrates diversity and is proud to be an equal opportunity employer. We are committed to an inclusive environment for all employees and applicants and will make all employment-related decisions without regard to race, color, religion, sex, national origin, sexual orientation, gender identity, age, disability, or veteran status.