Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#19718 Archived

Azul Works Inc

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Project
Dry Creek Road Bridge Over Dry Creek Replacement Project
Location
Dry Creek Road, Napa
Owner
Napa County
Bid Date
02/10/2025 at 01:00PM

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

Remove, Relocate, Demo

Excavation, Back fill, Irrigation, Concrete


The project is 0.8 miles west of Mt. Veeder Road and consist of replacing the existing bridge at a sharp curve in Dry Creek Road.  The proposed bridge structure would consist of an approximately 80-foot-long by 32-foot-wide single-span concrete slab bridge that is constructed on pre-cast and pre-stressed concrete girders.  The project also includes 900 feet of new roadway to remove two curves in Dry Creek Road

Bid Documents

Bid documents can be viewed at or obtained from:

Plans and Specifications

https://www.countyofnapa.org/3123/Dry-Creek-Road-Bridge-over-Dry-Creek-RDS

Contact

Azul Works Inc

1400 Egbert Avenue
San Francisco, CA 94124

Published 1/29/2025 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208