Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#19848 Archived

FBD Vanguard Construction, Inc.

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Reference
04-1Q8201
Project
Caltrans Contract #04-1Q8201 - Hwy 101 Hospital Curve CMGC
Location
San Francisco, CA
Owner
California Department of Transportation
Bid Date
04/30/2025 at 10:00AM

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

Lead Compliance Plan, Construction Area Signs, Traffic Control System, Traffic Control Supervisor, Stationary Impact Attenuator Vehicle, Temporary Traffic Stripe, Channelizer (Surface Mounted), Portable Changeable Message Sign, Temporary Barrier System, Temporary Crash Cushion, Job Site Management, Water Pollution Control Program, Temporary Drainage Inlet Protection, Street Sweeping, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Haz Waste), Treated Wood Waste, Noise Monitoring, Roadway Excavation, Plastic Pipe (Class 315) (Supply Line), Welded Steel Pipe Conduit, Control And Neutral Conductors, Move-In/Move-Out (Erosion Control), Hydromulch, Tack Coat, Hot Mix Asphalt, Rubberized Hot Mix Asphalt (Gap Graded), Geosynthetic Pavement Interlayer (Paving Grid), Place HMA Dike, Cold Plane Asphalt Concrete Pavement, Drill And Bond (Dowel Bar), Spall Repair (Polyester Concrete), Rapid Strength Concrete Base, Individual Slab Replacement (Rsc), Remove Concrete Pavement And Base, Continuously Reinforced Concrete Pavement, Structural Concrete (Drainage Inlet), Alternative Pipe Culvert, Alternative Slotted Pipe, Corrugated Steel Pipe Downdrain, Anchor Assembly, Abandon Culvert, Remove Culvert, Remove Inlet, Adjust Inlet, Adjust Manhole, Modify Inlet, Cap Inlet, Cleaning, Inspecting, And Preparing Culvert, Cured-In-Place Pipeliner, Minor Concrete (Curb And Gutter, Curb, Sidewalk & Curb Ramp), Manhole Frame And Cover, Inlet Frame And Grate, Concrete Backfill, Remove Minor Concrete (Curb, Gutter, And Sidewalk), Remove Roadside Sign Panel, Furnish Single Sheet Aluminum Sign, Roadside Sign, Install Sign (Strap & Saddle Bracket Method), Install Roadside Sign Panel on Existing Post, Midwest Guardrail System, Guardrail Delineator, Vegetation Control (Minor Concrete), End Cap, End Anchor Assembly, Alternative In-Line Terminal System, Buried Post End Anchor, Transition Railing, Remove Guardrail, Remove Concrete Barrier, Concrete Barrier, Concrete Barrier Transition, Concrete Surface Texture (Heavy Blast), Prepare And Paint Concrete, Thermoplastic Pavement Marking, Thermoplastic Traffic Stripe, Traffic Stripe Tape, Remove Thermoplastic Traffic Stripe, Remove Pavement Marker, Pavement Marker (Retroreflective), Inductive Loop Detector, Flashing Beacon System, Fiber Optic Cable Systems, Modifying Lighting Systems, Modifying Traffic Monitoring Stations, Trucking, and All Material Suppliers.
A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Bob Purdy at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

Bid Documents

Bid documents can be viewed at or obtained from:

100% PLANS & SPECS ARE AVAILABLE FOR VIEWING AT OUR LIVERMORE OFFICE, BY CONTACTING BOB PURDY & JACKSON LACOMBE VIA EMAIL ([email protected] / [email protected]) FOR A LINK TO THE DOCUMENTS, OR AT THE FOLLOWING WEBSITE:

https://app.buildingconnected.com/opportunities/67be148d801bc72424b09b4c/

Contact

FBD Vanguard Construction, Inc.

550 Greenville Road
Livermore, CA 94550

Published 3/11/2025 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208