Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

#19892 Archived
Steve P. Rados, Inc. logo

Steve P. Rados, Inc.

An Equal Opportunity Employer is requesting quotations from all qualified DBE sub-contractors and/or material suppliers for the following project:

Reference
01-011B
Project
INDIAN CANYON DRIVE SEWER
Owner
City of Palm Springs
Bid Date
03/28/2025 at 03:00PM

Scope / Description

We are requesting bids for the following trades and/or material suppliers:

SAND & GRAVEL SUPPLIER, BASE, ROCK, COBBLES, BOULDERS SUPPLIER, PIPE SUPPLIER, TRAFFIC CONTROL MATERIALS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TRAFFIC FLAGGERS, PLANE ASPHALT CONCRETE, DEVELOP WATER SUPPLY, DITCHES EXCAVATION, TEMPORARY EROSION CONTROL, AGGREGATE  BASE, ASPHALT CONCRETE PAVING, JOINTED PLAIN CONCRETE PAVEMENT, ROADSIDE SIGN, CORRUGATED STEEL PIPE (CSP), PLASTIC PIPE, SEWER MANHOLE, PLASTIC SEWER PIPE, SAW CUTTING, TEMPORARY FENCING, PAVEMENT MARKING & STRIPING, LAND SURVEYOR, CONSTRUCTION SCHEDULING, SWPPP PLANNING, TRAFFIC CONTROL PLANS, SUPER 10 DUMP TRUCK, WATER TRUCK, STREET SWEEPING TRUCK, CUTTING, SHORING, CONSTRUCTION, MICROTUNNEL, VIDEO RECORDING, POTHOLING

 

NAIC: 212319, 212321, 237110, 237310, 237990, 238910, 238990, 423510, 423990, 484220, 488490, 541330, 541370, 561730, 561990

Bid Documents

Bid documents can be viewed at or obtained from:

Plans and Specifications are available free of charge https://stevepradosinc.sharefile.com/d-s1611547d40c54706afad0158b2c17574 also available for viewing at 2002 E. McFadden Ave., Ste. 200, Santa Ana, CA 92705 call our office to schedule a review of the plans and specifications (714) 835-4612.


 S.P. Rados, Inc. is a Signatory Union Contractor. Subcontractors will be required to abide by the terms and conditions of the AGC Standard Long Form Subcontract incorporating prime contract terms and conditions, including payment provisions & insurance requirements.  S.P. Rados, Inc.’s listing of a subcontractor is not to be construed as an acceptance of all the subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Subcontractors will be required to provide a payment & performance bond from an approved surety company for 100% of the subcontracted work.  S.P. Rados, Inc. will pay bond premium up to 1.5% (optional). 

 

Please be advised, Contractors and Subcontractors must register with the D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with the D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify status of your D.I.R. number, please visit: http://.dir.ca.gov/Public-Works/Contractors.html.

 

Assistance is available in obtaining bonds, lines of credit and/or insurance. We will consider dividing total requirements when economically feasible into smaller tasks or quantities to permit participation by DBE in the competitive process. We will assist in obtaining necessary equipment, supplies, materials & related assistance or services. S.P. Rados, Inc. requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.

 

Contact

Steve P. Rados, Inc.

2002 E McFadden Ave., Ste. 200
Santa Ana, CA 92705

Published 3/24/2025 on Construction Bid Source a Trade and Focus Publication located at http://www.constructionbidsource.com

Phone: (888) 988-1208