Steve P. Rados, Inc.
An Equal Opportunity Employer
is requesting quotations from all qualified
DBE
sub-contractors and/or material suppliers for the following project:
Reference: H14910, H14911, H14912, H14913, H14914, H14915, H14916, H14917, H14918, H14853
Bridge Replacements on National Trails Highway at 10 Bridges
Owner: SAN BERNARDINO COUNTY DEPARTMENT OF PUBLIC WORKS
Bid Date: 06/05/2025 at 10:00AM
We are requesting bids for the following trades and/or material suppliers:
PIPE SUPPLIER, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, COLD PLANE ASPHALT CONCRETE, CLEARING & GRUBBING, HYDROSEEDING, AGGREGATE BASE, CONCRETE PUMPING, ASPHALT CONCRETE PAVING, PLACE ASPHALT CONCRETE DIKE & MISC, CAST-IN-DRILLED-HOLE CONCRETE PILING, REINFORCING STEEL, ROADSIDE SIGN, REINFORCED CONCRETE PIPE, METAL RAILING, CONCRETE BARRIER, PAVEMENT MARKING & STRIPING, LEAD COMPLIANCE PLAN, SWPPP PLANNING, SUPER 10 DUMP TRUCK, WATER TRUCK, STREET SWEEPING TRUCK, DEMOLITION,
Bid documents can be viewed at or obtained from:
Assistance is available in obtaining bonds, lines of credit and/or insurance. We will consider dividing total requirements when economically feasible into smaller tasks or quantities to permit participation by DBE, ESBE in the competitive process. We will assist in obtaining necessary equipment, supplies, materials & related assistance or services. S.P. Rados, Inc. requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation.
Plans and Specifications are available free of charge https://stevepradosinc.sharefile.com/d-sa37aec9c997545789ac732d0c5772969
and also available for viewing at 2002 E. McFadden Ave., Ste. 200, Santa Ana, CA 92705 call our office to schedule a review of the plans and specifications (714) 835-4612.
S.P. Rados, Inc. is a Signatory Union Contractor. Subcontractors will be required to abide by the terms and conditions of the AGC Standard Long Form Subcontract incorporating prime contract terms and conditions, including payment provisions & insurance requirements. S.P. Rados, Inc.’s listing of a subcontractor is not to be construed as an acceptance of all the subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Subcontractors will be required to provide a payment & performance bond from an approved surety company for 100% of the subcontracted work. S.P. Rados, Inc. will pay bond premium up to 1.5% (optional).
Please be advised, Contractors and Subcontractors must register with the D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with the D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify status of your D.I.R. number, please visit: http://.dir.ca.gov/Public-Works/Contractors.html.
237110, 237310, 238110, 238120, 238910, 238990, 423510, 484220, 488490, 541330, 541620, 561730,
Steve P. Rados, Inc.
2002 E McFadden Ave., Ste. 200
Santa Ana,
CA 92705
Phone:
916-475-1654
Email: [email protected]
Lucy Gonzalez
Published 5/14/2025 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: (888) 988-1208