Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

ID 20183

Archived

FBD Vanguard Construction, Inc.

An Equal Opportunity Employer
is requesting quotations from all qualified
DBE
sub-contractors and/or material suppliers for the following project:

Reference: 08-1L1804, Fed #ACNH-P091(162)E
08-1L1804 JPCP (RSC), Individual Slab Replacement (RSC) & Rubberized HMA, Riverside County, CA
Riverside, CA

Owner: State of California Department of Transportation: (CALTRANS/CADOT) CA

Bid Date:  08/06/2025 at 02:00pm

We are requesting bids for the following trades and/or material suppliers:

Lead Compliance Plan, Construction Area Signs, Traffic Control System, Traffic Control Supervisor, Stationary Impact Attenuator Vehicle, Temporary Pavement Marking (Paint) & Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Pavement Marker, Temporary Barrier System (Mash Tl-3), Temporary Pedestrian Access Route, Portable Changeable Message Sign, Temporary Automated End Of Queue Warning System, End Of Queue Monitoring And Warning With Truck Mounted Changeable Message Sign, Temporary Crash Cushion Module, Temporary Crash Cushion, Temporary Radar Speed Feedback Sign System, Stormwater Pollution Prevention Plan, Stormwater Annual Report, Temporary Soil Binder, Temporary Cover, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Construction Entrance, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Haz Waste), Treated Wood Waste, Noise Monitoring, Remove Concrete , Clearing And Grubbing, Roadway Excavation, Rock Blanket, Move-In/Move-Out (Erosion Control), Hydroseed, Class 2 Aggregate Base, Lean Concrete Base Rapid Setting, Replace Base, Base Bond Breaker, Replace Asphalt Concrete Surfacing, Prime Coat, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Place HMA Dike, Tack Coat, Remove AC Dike, Cold Plane Asphalt Concrete Pavement, Jointed Plain Concrete Pavement (Rsc), Drill And Bond (Dowel Bar), Individual Slab Replacement (Rsc), Isolation Joint Seal (Silicone), Remove Concrete Pavement And Base, Grind Existing Concrete Pavement, (Structural Concrete (Drainage Inlet), Minor Concrete (Minor Structure), Remove Culvert, Remove Inlet, Rock Slope Protection, Rock Slope Protection Fabric, Minor Concrete (Curb, Gutter, Curb Ramp), Detectable Warning Surface, Remove Concrete (Curb, Gutter, And Sidewalk), Miscellaneous Iron And Steel, Remove Pavement Marker, Delineator, Guard Railing Delineator, Pavement Marker (Retroreflective), Treatment Best Management Practice Marker, Remove Roadside Sign, Furnish Single Sheet Aluminum Sign, Furnish Single Sheet Aluminum Sign , Roadside Sign, Midwest Guardrail System, Vegetation Control (Minor Concrete), Double Midwest Guardrail System (Steel Post), Concrete Barrier, Transition Railing, Double Transition Railing, End Anchor Assembly, Alternative Crash Cushion, Alternative In-Line Terminal, Alternative Median Terminal, Concrete Barrier Transition, Remove Guardrail, Remove Concrete Barrier, Thermoplastic Pavement Marking, Preformed Thermoplastic Pavement Marking, Thermoplastic Traffic Stripe, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking,  Traffic Stripe Tape With Contrast, Contrast Stripe Paint, Remove 6" Traffic Stripe, Traffic Stripe Tape With Contrast, Maintaining Existing Traffic Management System Elements During Construction, Modifying Signal & Lighting Systems, Modifying Ramp Metering Systems, Modifying Traffic Monitoring Stations, and All Material Suppliers.

Bid documents can be viewed at or obtained from:

 Plans and specifications are available on request at our Livermore office

(550 Greenville Road, Livermore, CA 94550)

or at the following website:

https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project-calendar.php?q=08-1L1804

 A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

FBD Vanguard Construction, Inc.
550 Greenville Road
Livermore, CA 94550

Phone: 925-245-1300
Email: [email protected]
Erin Hutchison

Published 6/30/2025 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: (888) 988-1208