Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

ID 20225

Archived

Steve P. Rados, Inc.

An Equal Opportunity Employer
is requesting quotations from all qualified
DBE, WBE, SBE
sub-contractors and/or material suppliers for the following project:

Reference: Project No. 7972
Western Trunk Line Project – Phase 1

Owner: City of Los Angeles Dept. of Water & Power

Bid Date:  08/29/2025 at 02:00PM

We are requesting bids for the following trades and/or material suppliers:

SAND & GRAVEL SUPPLIER, BASE, ROCK SUPPLIER, PIPE SUPPLIER, TRAFFIC CONTROL SYSTEM, ASPHALT CONCRETE PAVING, GROUND ANCHOR/SOIL NAIL/TIE-BACK, CONCRETE STRUCTURE, PRECAST CONCRETE, REINFORCING STEEL, STRUCTURAL STEEL, PAINTING/COATINGS, PLASTIC PIPE, PAVEMENT MARKING & STRIPING, INSPECTION SERVICES, LAND SURVEYOR, SUPER 10 DUMP TRUCK, WATER TRUCK, STREET SWEEPING TRUCK

Bid documents can be viewed at or obtained from:

Assistance is available in obtaining bonds, lines of credit and/or insurance. We will consider dividing total requirements when economically feasible into smaller tasks or quantities to permit participation by DBE, WBE, SBE in the competitive process. We will assist in obtaining necessary equipment, supplies, materials & related assistance or services. S.P. Rados, Inc. requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. 


Plans and Specifications are available free of charge https://stevepradosinc.sharefile.com/d-s95e6ab6fb9c844a99ab4bb9dd9b0c8d9 also available for viewing at 2002 E. McFadden Ave., Ste. 200, Santa Ana, CA 92705 call our office to schedule a review of the plans and specifications (714) 835-4612.


 S.P. Rados, Inc. is a Signatory Union Contractor. Subcontractors will be required to abide by the terms and conditions of the AGC Standard Long Form Subcontract incorporating prime contract terms and conditions, including payment provisions & insurance requirements.  S.P. Rados, Inc.’s listing of a subcontractor is not to be construed as an acceptance of all the subcontractor’s conditions or exceptions included with the Subcontractor’s price quote. Subcontractors will be required to provide a payment & performance bond from an approved surety company for 100% of the subcontracted work.  S.P. Rados, Inc. will pay bond premium up to 1.5% (optional). 

 

Please be advised, Contractors and Subcontractors must register with the D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with the D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify status of your D.I.R. number, please visit: http://.dir.ca.gov/Public-Works/Contractors.html.

 

NAICS:

212319, 212321, 237110, 237310, 238110, 238120, 238320, 238910, 423510, 484220, 488490, 541330, 541370

Steve P. Rados, Inc.
2002 E McFadden Ave., Ste. 200
Santa Ana, CA 92705

Phone: 714-835-4612
Email: [email protected]
Lucy Gonzalez

Published 8/21/2025 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: (888) 988-1208