Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

ID 20237

Archived

George Reed, Inc.

An Equal Opportunity Employer
is requesting quotations from all qualified
DBE
sub-contractors and/or material suppliers for the following project:

Reference: Contract # 02-3H7704
Construction on State Highway in Tehama County in and near Los Molinos from Butte County Line to Molinos Creek Bridge
Los Molinos

Owner: Caltrans

Bid Date:  08/27/2025 at 02:00PM

We are requesting bids for the following trades and/or material suppliers:
Seeking All DBE Subcontractors/Suppliers needed for, including but not limited to: CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM/TRAFFIC FLAGGERS;TEMPORARY RAILING (TYPE K); PLANE ASPHALT CONCRETE; HYDROSEEDING; EROSION CONTROL; TEMPORARY EROSION CONTROL; SEAL COAT; ASPHALT CONCRETE; PAVING ASPHALT (ASPHALT CONCRETE); PLACE ASPHALT CONCRETE DIKE & MISC.; MINOR CONCRETE STRUCTURE; ROADSIDE SIGN; REINFORCED CONCRETE PIPE; CORRUGATED METAL PIPE (CSP); DOWNDRAIN; WELDED STEEL PIPE; ROCK SLOPE  PROTECTION; CONCRETE CURB & SIDEWALK-MISC.; SAWCUTTING; FENCING; OBJECT MARKER; METAL BEAM GUARD RAILING; CRASH CUSHION; THERMOPLASTIC TRAFFIC STRIPING & MARKING; PAINTED TRAFFIC STRIPING & MARKING; PAVEMENT MARKER; SIGNAL & LIGHTING; LEAD COMPLIANCE; SWPPP PLANNING; TRUCKING; WATER TRUCK; STREET SWEEPING TRUCK; OIL ASPHALT SUPLLIER/ASPHALT OIL TANKERS; RUMBLE STRIPS or any item of work or material you are qualified to perform or furnish.  NON- DBE SUPPLIERS: You will be expected to carry a proportionate percentage of 2nd-tier DBE participation with your quote.  Second-tier DBE participation will be evaluated with your price.

Bid documents can be viewed at or obtained from:
The plans and specifications may be viewed in our office, at your local Builders Exchange or purchased through https://dot.ca.gov/Work-with-Caltrans

GEORGE REED, INC. is signatory to Operating Engineers, Laborers, and Cement Masons Unions.     100% Performance and Payment Bonds may be required for the full amount of subcontract price.     GEORGE REED, INC. will pay bond premiums of up to 2%. The subcontractor must possess current insurance and workers compensation coverage meeting Owner’s and GRI’s insurance requirements. Insurance waiver of subrogation is also required. Please call if you need assistance with bonding, lines of credit, insurance, obtaining necessary equipment, supplies, materials, or any related services; or assistance with breaking down items into economically feasible units or establishing flexible time frames for performance and delivery schedules to encourage or facilitate your participation. GEORGE REED, INC. is an Equal Opportunity Employer.

George Reed, Inc.
P.O. Box 4760
Modesto, CA 95352

Phone: 209.523.0734
Email: [email protected]
Adam Hanson

Published 7/23/2025 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: (888) 988-1208