Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

ID 20346

Archived

Reyes Construction

An Equal Opportunity Employer
is requesting quotations from all qualified
WBE, SBE, VOSB, SDB, WOSB, SDVOSB
sub-contractors and/or material suppliers for the following project:

B-380 Concrete Stairs and Slope Erosion Repair
Naval Weapons Station Seal Beach (NWSSB) Detachment Fallbrook - Fallbrook, CA

Owner: NAVFAC Southwest

Bid Date:  08/29/2025 at 02:00pm

We are requesting bids for the following trades and/or material suppliers:
Subcontractors- Painting & Coating, Geotechnical Engineer, Quality Control, Surveying, Applied Polyurethane Foam, Sawcutting, Hydroseed, Railing, Utility Locating, CCTV Inspection


Suppliers- Misc. Metals, Geotextile, Erosion Control, Trench Drain, Aggregates & Asphalt, Ready- mix concrete,  Rip rap, Lighting Fixtures (Solar-powered)

Bid documents can be viewed at or obtained from:

For information on the availability of scope of work, plans, and specifications, please contact our office. 

Plans, Specifications, and Contract requirements can be viewed at no additional cost:
1) Via iSqFt- Please send an email request to [email protected]
2) In person at Reyes Construction Headquarters (please email for appointment)
Please e-mail Questions and Quotes to: [email protected]

 

Engineering Estimate- $500,000


Project Details- 
This is a Design-Build construction project.
The project site is located in Naval Weapons Station Seal Beach Detachment Fallbrook, California
(address 700 Ammunition Road, Fallbrook, CA 92028). There is a parking lot located south of Building 380 that serves as the main parking for government/civilian employees. A concrete stairway serves as the access pathway from the parking lot to the walkway leading to Building 380. 
The objectives for the Base Bid scope of work includes: 
1) Reestablish bearing below concrete stairs/approach slabs so that the stairs/slabs are safe to walk on. Currently there are voids underneath the stairs due to erosion and rodent burrowing. Applying Polyurethane Foam is the method to reestablish bearing for the concrete stairs/approach slabs. 
2) Protect stairs against future rodent burrowing and erosion that would undermine stairs/slabs
3) Prevent sedimentation on walkways leading from concrete stairs to Building 380
4) Install new solar lighting and handrail loops/painting.

The objectives for the Options scope of work includes: 
1) Placing erosion protection in/on an erosion gully in the slope close to the parking lot.
2) Cleanout and inspect a storm drain, which consist of a conduit with multiple catch basin and terminates at an outlet culvert. 

Assistance will be available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials or related technical assistance.

Reyes Construction, Inc. is signatory to the following unions: Teamsters, Operators, Cement Masons, Carpenters and Laborers.


 

Reyes Construction
1383 S. Signal Drive
Pomona, CA 91766

Phone: 909-622-2259
Email: [email protected]
Brenda Martinez

Published 8/14/2025 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: (888) 988-1208