Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

ID 20567

Archived

Golden State Bridge, Inc.

An Equal Opportunity Employer
is requesting quotations from all qualified
DBE, DVBE, UDBE, MBE, WBE, SBE
sub-contractors and/or material suppliers for the following project:

Route 101 Bicycle and Pedestrian Overcrossing, Santa Rosa, CA

Owner: City of Santa Rosa CA

Bid Date:  12/18/2025 at 02:00pm

We are requesting bids for the following trades and/or material suppliers:

Sub Trades needed, but not limited to: Construction Staking, Lead Compliance, Develop Water Supply, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle (Dav), Type Ill Barricade, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Portable Flashing Beacons, Portable Radar Speed Feedback Sign System, Temporary Pavement Marker, Temporary Barrier System, Temporary Barrier System (City), Temporary Pedestrian Access Route, Portable Changeable Message Sign (Ea), Temporary Crash Cushion TL-3, Temporary Radar Speed Feedback Sign System, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Storm Water Sampling & Analysis Day, Storm Water Annual Report, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Modified Temporary Construction Entrance (Type 2), Street Sweeping, Temporary Concrete Washout, Remove Yellow Thermo Jraffic Stripe (Haz Waste), Contractor-Supplied Biologist, Noise Monitoring, Remove Gas Line, Tree Protection (Temp. High Visibility Chain Link Fence), Clearing And Grubbing, Roadway Excavation, Structure Excavation (Bridge)*, Structure Excavation (Type D)*, Sand Bedding, Structure Backfill (Bridge) *, Structure Backfill (Retaining Wall) *, Prune Existing Plants, 2' Decorative Boulders, 3' Decorative Boulders, 4' Decorative Boulders, Stepping Stones, Soil Testing, Plant (Group K), Plant (Group A), Plant (Group B), Maintain Existing Planted Areas, Plant Establishment Work (3 Year), Wood Mulch (Tree Trimmings), Cast Iron Tree Grate, Wire Rope Trellis System, Temporary Irrigation Sys (Water Truck), Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Control And Neutral Conductors, 1" Remote Control Valve (Master Valve), 1" Wye Strainer Assembly, 12 Station Irrigation Controller (Wall Mounted), 1" Copper Pipe (Supply Line) *, 1/2" Drip Irrigation Tubing*, 1/2" Drip Irrigation Tubing (Purple, Recycled Water) *, Drip Transition, Drip Flush Valve (Custom), 1" Backflow Preventer Assembly, Backflow Preventer Enclosure, Backflow Preventer Blanket, Flow Sensor, Drip Valve Assembly, Drip Valve Assembly (Purple, Recycled Water), 1" Gate Valve, 1" Plastic Pipe (Schedule 40}(Supply Line) *, 1" Plastic Pipe (Schedule 40}(Supply Line}(Purple, Recycled Water)*, 2" Plastic Pipe (Schedule 40)(Supply Line) *, 2" Plastic Pipe (Schedule 40)(Supply Line)(Purple, Recycled Water) *, 1" Pressure Regulating Valve, Quick Coupling Valve (W/Swing Joint & Key & Hose Swivel), Quick Coupling Valve (W/Swing Joint & Key & Hose Swivel) Purple, Recycled Water, PVC Pipe Conduit (Sleeve)(6" Class 315) *, Collapsible Bollard, Compost, Class 2 Aggregate Base, Hot Mix Asphalt (Type A), Cold Plane Asphalt Concrete Pavement, Joint Seal (Silicone), Isolation Joint Seal (Preforemed Comoression), 60" Cast-In-Drilled-Hole Concrete Piling, 84" Cast-In-Drilled-Hole Concrete Piling, Prestressing (Backstay Anchors), Structural Concrete, Bridge Footing*, Structural Concrete, Bridge*, Structural Concrete, Bridge (Polymer Fiber), Structural Concrete, Retaining Wall, Concrete Surface Texture A, Concrete Surface Texture B, PTFE Sphericalk Bearing, Joint Seal (MR 1"), Joint Seal (MR 1 1/2"), Retaining Wall / Barrier at Bent 8 (Minor Structure), Concrete Seat Walls (Minor Structure), Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Retaining Wall), Headed Bar Reinforcement, Furnish Structural Steel (Superstructure), Furnish Structural Steel (Pylon), Erect Structural Steel (Superstructure), Erect Structural Steel (Pylon), Stay Cable Assemblies, Expansion Joint Assemblies, Tuned Mass Damper, Clean and Paint Structural Steel, Public Safety Plan, Prepare Concrete Bridge Deck Surface, Prepare Steel Bridge Deck Surface, Furnish Polyester Concrete Overlay , Furnish Polyester Concrete Overlay (Integrally Colored), Place Polyester Concrete Overlay*, Furnish Polyester Concrete Overlay (Zinc), Furnish Polyester Concrete Overlay (Zinc)(lntegrally Colored), Place Polyester Concrete Overlay (Zinc), Misc. Metal (Restrainer-Cable Type) *, Concrete Backfill (Pipe Trench)*, Imported Biofiltration Soil, 6" Perforated Plastic Pipe Underdrain, Class 2 Permeable Material (Blanket) *, Storm Drain Label, Abandon Culvert, Abandon Inlet, Remove Culvert, Remove Inlet, Cap Inlet, Sand Backfill, Small Rock Slope Protection (0.35) *, Detectable Warning Surface, Concrete Pavement (Pavement Treatment), Minor Concrete (Curb, Gutter, Sidewalk And Driveway), Minor Concrete (Curb Ramp), Concrete Paving System (Field)(Pavement Treatment 1), Concrete Paving System (EdQe)(Pavement Treatment 2), Remove Concrete Curb, Remove Concrete Sidewalk And Driveway, Remove Concrete (Curb And Gutter), Pre/Post Construction Surveys, Misc Metal (Bridge), Bridge Deck Drainage System, Lighting (City Street), 6" Sewer Lateral, Sanitary Sewer Testing and Inspection, Remove Sanitary Sewer, Remove Sewer Manhole, Remove Water Line, Remove Fire Hydrant, Abandon Sewer Pipe, Install Fire Hydrant System, Remove Fire Service, Install Fire Service, 1" Water Service, 6" Water Line, 8" Combination Water Service, City of Santa Rosa Storm Drain Method, City of Santa Rosa Type I Catch Basin, City of Santa Rosa Type II Catch Basin, City of Santa Rosa 3" Sidewalk Drain, City of Santa Rosa 3" x 12-1/2" Cast Iron Sidewalk Drain, City of Santa Rosa Side Opening Field Drain, 6" Area Drain, 12" x 12" Area Drain, Convert Drainage Inlet to Storm Drain Manhole, 6" High Density Polyethylene Pipe (Type S), 12" Reinforced Concrete Pipe, 15" Reinforced Concrete Pipe, 18" Reinforced Concrete Pipe, 27" Reinforced Concrete Pipe, 30" Reinforced Concrete Pipe, Storm Drain Video Inspection, Chain Link Fence (Type Cl-6), Guard With Fencing (Tall Stanchions), Guard With Fencing (Forestays), Remove Chain Link Fence, Remove Pavement Marker, Remove Delineator, Guard Railing Delineator, Delineator (Special - K-71), Pavement Marker (Retroreflective), Roadside Sign (One Post)(2" I.D. Galvanized Steel Post), Object Marker (Type P), Remove Roadside Sign, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Midwest Guardrail System, Vegetation Control (Minor Concrete), Guard, Guard With Handrail, Guard With Expansion, End Anchor Assembly (Type SFT-M), Alternative In-Line Terminal Tl-3, 4" Thermoplastic Traffic Stripe, 6" Thermoplastic Traffic Stripe, 8" Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, Thermoplastic Pavement Marking (Enhanced Wet Night Visibility), 12" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 18-12), Paint Traffic Stripe (1-Coat), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 18-12), 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility), 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 12-3), Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Bike Ped Counter, Temporary Lighting Systems, Mobilization

ALL ITEMS CAN BE BID IN FULL OR PARTIAL QUANTITIES

Bid documents can be viewed at or obtained from:

Plans for this project are available for review at the office of Golden State Bridge, Inc. 3701 Mallard Drive, Benicia, CA 94510 between the hours of 8:00 and 5:00 pm. If you would like the Plans and Specs emailed, please send your request to David Riccitiello at [email protected].

Please call to discuss how Golden State Bridge, Inc. can assist you in your bonding, credit, and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, or materials for this project.

If you are interested in submitting a subcontractor bid for this project, please fax us your quote at 925-372-8001. Should you have any questions regarding this bid, you may contact David Riccitiello at 925-372-8000.

Please be advised, Contractors and subcontractors must register with The D.I.R. (Department of Industrial Relations) in order to bid on public works projects. Registration with The D.I.R. costs $400 and covers the fiscal year (July 1 to June 30th).To verify the status of your DIR number, please visit http://www.dir.ca.gov/Public-Works/Contractors.html.

We are an Equal Opportunity Employer

Golden State Bridge, Inc.
3701 MALLARD DRIVE
BENICIA, CA 94510

Phone: 925-372-8000
Email: [email protected]
David Riccitiello

Published 11/12/2025 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: (888) 988-1208