Azul Works Inc
An Equal Opportunity Employer
is requesting quotations from all qualified
DBE, DVBE, UDBE, MBE, WBE, SBE, LPB, SLBE
sub-contractors and/or material suppliers for the following project:
Reference: 15TC-121
MW-12 North Slope Stabilization, San Francisco, CA
Fairfax, California
Owner: San Francisco Bay Area Rapid Transit District (BART) CA
Bid Date: 02/17/2026 at 02:00pm
We are requesting bids for the following trades and/or material suppliers:
Questions and proposals can be sent via email to: [email protected]
Bid documents can be viewed at or obtained from:
Project docs can be found here: https://spaces.hightail.com/space/sFAxgGeFzO
Project Description:
The Work includes, but is not limited to furnishing all labor, equipment, materials, and services required to implement the stabilization of the eroded north slope on north side of the BART tracks within BART parcel in the vicinity of BART Maintenance of Way (MW-12) in the City of Walnut Creek.
The Base Bid includes such Work on the slope stabilization including drainage improvements, repairing and revegetating the existing slope, surface improvements, fence repair and Springbrook access road improvement. Option work, such as additional rolled erosion control Product Turf Reinforcement Mat (RECP – TRM) including hydroseeding, and access road improvement, may be included, at the discretion of the District, subject to available funding.
Azul Works Inc
1400 Egbert Avenue
San Francisco,
CA 94124
Phone:
415-558-1507
Email: [email protected]
Sandra Hernandez
Published 2/10/2026 on
Construction Bid Source a Trade and Focus Publication
located at http://www.constructionbidsource.com
Phone: (888) 988-1208