Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#581145 Posted 4/8/2021

Design-Build Construction of West Side Tanks & Pump Station Operations Crew Facility, Roseville, CA

Owner Reference
08-089
Bid Date
Jun 10, 2021 at 03:00PM
Pre-Bid
Mandatory - 4/21/2021 @ 10:00AM @ (for location please or )
Owner
City of Roseville CA

Description

The work includes, but is not limited to, Design, Permitting and Construction of a new Crew Building at the West Side Tanks and Pump Station site 4501 Westpark Drive, Roseville, CA 95747. The Crew Building will consist of a nominal 3400 square foot metal building with approximately 50% of the floor space built as office space and 50% of the floor space built as a high-ceiling two-bay mechanic shop. The architectural design and finishes of the facility will match and/or be complimentary to the West Side Pump Station facility located on the same site. Paved and gravel parking areas will be provided with the facility and the site, and site drainage will be completed in coordination with the overall facility layout. Electrical and control systems located in the crew facility will be coordinated with the West Side Pump Station including the overall City communications system. Prevailing wages.

Contact

CBS ID: 581145 | Published 4/8/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.