This posting has been archived
#583909
•
Posted 5/19/2021
Active Transportation For El Monte Station & Downtow El Monte, El Monte, CA
- Bid Date
- Jun 9, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 5/3/2021 @ 11:00AM @ (for location please or )
- Estimate
- $2,170,000
- Owner
- City of El Monte CA
Description
The proposed work consists of cold milling existing asphalt concrete pavement, removing and constructing full depth asphalt concrete pavement, constructing ARHM overlay, curb and gutter, curb ramps, and driveways and installing signing, striping, and bike racks and modifying traffic signals as set forth in the Contract Drawings and Technical Specifications for the project.The project limits are on Ramona Blvd from Santa Anita to Tyler Ave, on Tyler Ave from Ramona Blvd to Santa Anita Ave, and on Santa Anita Ave from Tyler Ave to Lower Azusa Rd. Bonds required. Prevailing wages. Q&A due by 05/06/21 at Noon.
Contact
- David Maher
- (714) 873-0430
- [email protected]
CBS ID: 583909 | Published 5/19/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.