Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#583909 Posted 5/19/2021

Active Transportation For El Monte Station & Downtow El Monte, El Monte, CA

Bid Date
Jun 9, 2021 at 02:00pm
Pre-Bid
Mandatory - 5/3/2021 @ 11:00AM @ (for location please or )
Estimate
$2,170,000
Owner
City of El Monte CA

Description

The proposed work consists of cold milling existing asphalt concrete pavement, removing and constructing full depth asphalt concrete pavement, constructing ARHM overlay, curb and gutter, curb ramps, and driveways and installing signing, striping, and bike racks and modifying traffic signals as set forth in the Contract Drawings and Technical Specifications for the project.The project limits are on Ramona Blvd from Santa Anita to Tyler Ave, on Tyler Ave from Ramona Blvd to Santa Anita Ave, and on Santa Anita Ave from Tyler Ave to Lower Azusa Rd. Bonds required. Prevailing wages. Q&A due by 05/06/21 at Noon.

Contact

CBS ID: 583909 | Published 5/19/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.