Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#585223 Posted 5/5/2021

Silverado Ranch Boulevard - Jones Boulevard to Arville Street - Phase A, Las Vegas, NV

Owner Reference
605750-20
Bid Date
Aug 31, 2021 at 02:00pm
Pre-Bid
Scheduled - 12/8/2020 @ 10:00am @ (for location please or )
Estimate
$7,851,626 - $8,678,112
Owner
County of Clark, NV

Description

Silverado Ranch widening from Jones Blvd. to Arville St.-Phase A and Decatur Blvd from Gary Ave to approx. 700-ft south of Silverado Ranch Blvd. Widening on Silverado Ranch Blvd will permit to accommodate two 11-ft asphalt paved lanes each direction, a 12-ft concrete raised median, and 4-ft to 8-ft paved shoulders, ITS conduit installation, storm drain pipe installation, drop inlet construction, graded swale, concrete curb installation, sidewalk construction, and street light installation. The proposed roadway will be constructed of Hot-Mix Asphalt and Ultra-Thin Asphalt Concrete Surface (UTACS). Traffic signal relocation, advanced loop detector installation, and sign replacement and/or installation. CCRFCD facilities include construction of the Decatur Blvd Storm Drain, drainage improvements also include,10' x6' RCB, 60” Storm Drain Manholes, 48” Storm Drain Manholes, 5’ and 20’ Drop Inlets, and various storm drain pipe sizes ranging from 18” to 60”. Addendum extends bid date. Bonds required and prevailing wages.

Contact

CBS ID: 585223 | Published 5/5/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.