Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#585597 Posted 5/8/2021

2021 Barlow Mechanical Fuels Reduction, Hood NF, Dufur OR

Owner Reference
1240BD21Q0078
Bid Date
Jun 7, 2021 at 01:00pm
Pre-Bid
Scheduled - 5/19/2021 @ 09:00am @ (for location please or )
Owner
US Department of Agriculture (Everett)

Description

Total Small Business Set-Aside The slash layer to a depth of 2 to 6 inches and to eliminate vegetative competition of brush and small diameter saplings through grapple piling and mastication. Logs greater than 18 inches in diameter will be left in place. Summary of work: Mandatory (Item 1) Machine Piling = 1,406 Acres; Mandatory (Item 2) Mastication = 502 Acres; Optional (Item 3) Machine Piling = 922 Acres; Optional (Item 4) Mastication = 1,473 Acres. Bonds & prevailing wages apply

Contact

CBS ID: 585597 | Published 5/8/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.