Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#585661 Posted 5/23/2021

Offsite Dual 6 Inch Diameter Brine Line Discharge Line From EWTP Expansion Phase III Project, Chino, CA

Owner Reference
IFB#20217018
Bid Date
Jun 22, 2021 at 02:00pm
Pre-Bid
Mandatory - 5/18/2021 @ 02:00PM @ (for location please or )
Estimate
$5 MIl
Owner
City of Chino, Public Works/Engineering, CA

Description

Offsite Dual 6 Inch Diameter Brine Line Discharge Line From EWTP Expansion completion time of project WA19C, DWSRF Project No. 3610012-007C Phase III. Work may include but not be limited to: Will include construction of approximately 18,640 lineal feet of dual 6” diameter DR-35 PVC pipeline to carry brine and 34 (each) five (5) feet diameter sewer manholes installed in conjunction with the pipeline. The construction will be on Euclid Avenue (State Route 83 (SR83)) in Caltrans right of way, Merrill Avenue in the City of Chino right of way, Bon View Avenue, Schaefer Avenue both being in the City of Ontario right of way. Traffic control plans and implementation will be required for the duration of the construction activities. Removal of approximately 180 trees and roots in City of Ontario right of way along Bon View Avenue. Protect in place existing improvements. Replacement of existing improvements such as fences, walls, landscaping and irrigation. Pavement repair, grind and overlay and street restoration. Pavement markings, RPM and legends as necessary due to disturbance from construction activities. Completion time is 260 calendar days. Bonds required. Prevailing wages. Q&A due by 06/02/21 at 10AM. DBE/MBE/WBE goals

Contact

CBS ID: 585661 | Published 5/23/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.