This posting has been archived
#585665
•
Posted 5/8/2021
N. Mel Waiters Way 24-inch Water Main Replacement – Phase II, San Antonio, TX
- Owner Reference
- CO-00417-SM/21-4001
- Bid Date
- Jun 9, 2021 at 10:00AM
- Pre-Bid
- Encouraged - 5/17/2021 @ 02:00PM @ (for location please or )
- Estimate
- $1,792,537
- Owner
- San Antonio Water System (SAWS), Contracting Office, TX
Description
Sealed bids are requested by the San Antonio Water System for the construction of approximately 1,770 linear feet of 24-inch diameter ductile iron water main, approximately 100 linear feet of 6-inch to 12-inch PVC water main, air release/vacuum valves and concrete vaults, butterfly valves, approximately 120 linear feet of jacking or boring, minor sewer main adjustments, and associated appurtenances for the N. Mel Waiters Way 24-inch Water Main Replacement – Phase II. Q&A due by 05/24/21 at 4PM. Bonds required. Prevailing wages. SMDWVBEgoals.
Contact
- Stella Manzello
- (210) 233-3854
- (210) 233-4290
- [email protected]
CBS ID: 585665 | Published 5/8/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.