This posting has been archived
#585668
•
Posted 6/7/2021
Demo & New Construction: Playa Drain Trail: Phase II - Segment 2, El Paso, TX
- Owner Reference
- 2021-1232
- Bid Date
- Jun 16, 2021 at 02:00pm
- Pre-Bid
- Encouraged - 5/12/2021 @ 10:00am @ (for location please or )
- Estimate
- $900000-$ 1 Mil
- Owner
- City of El Paso TX
Description
The project consists of the removal and disposal of existing concrete driveways, sidewalks, handicap ramps, curb, and curb and gutter, etc., in preparation for the construction of a new walking trail and included amenities. The work also involves the construction of new concrete sidewalk, curb, curb and gutter, ADA wheelchair ramps, fiber reinforced concrete curb and asphalt trail, post and cable fencing, collapsible and fixed bollards, benches, picnic tables, stone columns and a stone sign wall, wayfinding signs, distance markers, trash receptacles, landscape and irrigation improvements along the Playa Drain Trail from Knights Drive to Yarbrough Drive as described through the plans and specifications. Q&A due by 05/19/21. Bonds required, Prevailing wages. HUB goals.
Contact
- Crystal Paz
- (915) 202-0065
- (915) 212-0044
- [email protected]
CBS ID: 585668 | Published 6/7/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.