This posting has been archived
#585815
•
Posted 5/10/2021
FIN Dredge Project Panama City, FL
- Owner Reference
- PC21-039
- Bid Date
- Jun 10, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 5/20/2021 @ 10:00am @ (for location please or )
- Owner
- City of Panama City
Description
We are seeking bids to have approximately 15,000 cubic yards of material removed from Watson Bayou mechanically using a hydraulic clam shell bucket. and placed into a water tight barged. The spoil material must be barged to Eastern Shipbuilding’s Allanton facility for placement in the permitted spoil ponds. The material must be transported from the barge to the spoil ponds using water tight trucks. This work needs to be complete by August 20, 2021.
Contact
- Steven Lewis
- (850) 872-3070
- [email protected]
CBS ID: 585815 | Published 5/10/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.