Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#585850 Posted 6/3/2021

Districtwide Security Access and Locks, El Cajon, CA

Owner Reference
B21.003
Bid Date
Jun 14, 2021 at 02:00pm
Pre-Bid
Encouraged - 5/24/2021 @ 02:00PM @ (for location please or )
Estimate
$950,000
Owner
Grossmont Cuyamaca Community College District CA

Description

The scope of the District Wide Access Controls Upgrade and Door Hardware Upgrade will include modification and upgrades to the access control system. The modifications include: hardware replacement, software, engineering, installation, licensing and programming. Classroom door hardware will be upgraded and modified. Classrooms without Access Control will be upgraded with thumb turn hardware. Modifications to classrooms with Access Controls will be modified to include a switch that will be installed on the wall next to door to bypass the access controls device. DVBE MBE/DBE/WBE/SBE 3% goals. Bond required. Prevailing wages.

Contact

CBS ID: 585850 | Published 6/3/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.