Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#585905 Posted 5/11/2021

Reuse Reservoir Expansion and Pump Station Replacement New Smyrna Beach, FL

Owner Reference
ITB 15-21
Bid Date
Jun 22, 2021 at 02:30pm
Pre-Bid
Scheduled - 5/25/2021 @ 02:00pm @ (for location please or )
Owner
City of New Smyrna Beach (Utilities Commission)

Description

Expand the existing reclaimed water reservoir located at the Water Reclamation Facility, 3119 S.R. 44, New Smyrna Beach, and replace the existing reuse pump station and intake structure. Expansion of the reclaimed water reservoir includes excavation, soil/erosion control, signage, demolition, grading, sodding, dewatering, clearing/grubbing, construction of berms and embankments, pumping and all other restoration and site work shown on the plans or listed in the specification to complete the construction. Replacement of the reuse pump station and intake structure includes demolition of the existing pump station, and construction of the new wetwell, intake, and pump station. Also included in the project scope is yard piping, concrete driveway, fencing, and electrical/instrumentation as detailed in the plans and specifications. Question End Date 6/4/2021 2:30 PM Bid Bond Required

Contact

CBS ID: 585905 | Published 5/11/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.