Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#586023 Posted 6/4/2021

MBGC Irrigation & Electrical Upgrades & MBCG Clubhouse Demo Portable Building Installation, San Diego, CA

Owner Reference
K-21-1919-DBB-3
Bid Date
Jun 10, 2021 at 02:00pm
Pre-Bid
Mandatory - 5/25/2021 @ 10:00am @ (for location please or )
Estimate
$6,600,000
Owner
City of San Diego, Public Works Contracts, CA

Description

Work for MBGC Irrigation & Electrical Upgrades includes demolition, grading, installation of new golf course irrigation, electrical service and distribution equipment, electrical equipment pre-manufactured building, water service lines and drinking fountains, fencing, turf repair, potholing, all necessary special inspections, permits and fees and all other incidental work and appurtenances in accordance with Plans 39986-01-D through 39986-29-D, inclusive, and the specifications. Work for MBGC Clubhouse Demo/Prtbl Building Installation provides for the demolition of the existing clubhouse building, construction of two separate pre-manufactured buildings; one for golf operations and one for food service, one (1) temporary trailer for Golf Operations and one (1) temporary trailer for bathrooms throughout construction, according to the list of requirements, floor plan and location map provided, inclusive, and these specifications., turf repair, drainage, shade trellises, landscaping, irrigation, hardscape, parking lot and path of travel accessibility ugrades, potholing, all necessary special inspections, permits and fees and all other incidental work and appurtenances in accordance with Plans 40268-01-D through 40268-65-D, inclusive, and the specifications, except improvements related to Additive Alternate A. Project duration is 330 working days. Bonds required. Prevailing wages apply. SLBE Participation: 3.9%; ELBE participation is 5.2%. Total mandatory participation is 9.1%

Contact

CBS ID: 586023 | Published 6/4/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.