This posting has been archived
#587420
•
Posted 5/21/2021
CMAR - Camp Loop Repairs, Cedar Hill State Park, Dallas Co., TX
- Owner Reference
- 1210194
- Bid Date
- Jun 24, 2021 at 02:00pm
- Pre-Bid
- Strongly Encouraged - 6/3/2021 @ 10:00am @ (for location please or )
- Estimate
- $11,000,000.00 - $13,000,000.00
- Owner
- Texas Parks and Wildlife, TX
Description
The Construction Manager at Risk shall provide preconstruction services to include consultation, value engineering, constructability reviews and cost estimating during the design phases of the work, construction services, closeout and warranty phase services for the Camp Loop Repairs for the Shady Ridge and Eagle Ford Camp Loops at Cedar Hill State Park. The repairs to the Shady Ridge and Eagle Ford Camp Loops includes, but is not limited to, shoreline stabilization and erosion control; excavation and fill; replacement and relocation of campsites including picnic canopies, slabs, tables, timber stairs, timber walls and other amenities; removal and
replacement of parking pads at campsites; drainage improvements; landscaping and tree vegetation; upgrade of electrical service to the campsites at Shady Ridge; extension of waterline along the North Spine Road; replacement and improvements to lift stations; replacement of waterline mains and campsite service connections
at Shady Ridge and removal and replacement of four (4) restroom buildings and associated parking. For planning purposes, the pre-construction time period is estimated to be three hundred ten days (310) calendar days. The construction contract period is projected for a term of six hundred twenty (620) calendar days except as may be otherwise amended or negotiated. Questions are due by June 8th @ 5:00 PM. Bonds required. prevailing wages apply. HSP not required until Part Two of the Project.
Contact
- Serena Holster
- (512) 389-8761
- [email protected]
CBS ID: 587420 | Published 5/21/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.