Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#587598 Posted 5/28/2021

Wood Hall Recording Studio Construction, Warrensburg, MO

Owner Reference
21-049
Bid Date
Jun 29, 2021 at 02:00pm
Pre-Bid
Mandatory - 6/10/2021 @ 10:00am @ (for location please or )
Owner
University Of Central Missouri, MO

Description

The project consists of the removal of existing walls, acoustical panels ceilings, flooring, lights and diffusers in two areas of the ground floor. Convert these spaces into high-quality recording studio spaces comprising multiple control rooms sharing central recording spaces. Each of the central spaces incorporate isolation booths including a larger recording area. The intent is for each space to be acoustically isolated from all other spaces and from surrounding spaces in Wood Hall (e.g. hallway, upper floors, neighboring rooms). Wall/ceiling/door construction to provide 60+ dB of isolation from surrounding spaces in the frequency range of 30Hz – 20kHz. Bonds required. Prevailing wages.

Contact

CBS ID: 587598 | Published 5/28/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.