This posting has been archived
#587672
•
Posted 5/24/2021
Toho-Valencia Trail II, Kissimmee, FL
- Owner Reference
- IFB2020-008
- Bid Date
- Jun 29, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 6/1/2021 @ 02:00pm @ (for location please or )
- Owner
- City of Kissimmee
Description
The project includes the construction of approximately 0.35 miles of 10-ft wide and 0.03 miles of 8-ft wide concrete shared use path in the City of Kissimmee. The project begins at the east end of the Mill Slough Bridge (Bridge #920112) and construction begins 200 feet east of the begin project limit. The path follows the eastbound lanes of US 192 for 0.33 miles to the US 192 and Denn John Lane intersection and then follows the southbound lanes of Denn John Lane for 0.05 miles to the end construction limit at Old Boggy Creek Road. The end project limit is at the existing Valencia College trail, 215 feet north of the end construction limit. Drainage improvements include minor ditch modifications, extension of cross drains, and reconstructing mitered end sections. Bid Bond Amount 5% of total bid
Contact
- Debbie Luke
- (407) 518-2214
- [email protected]
CBS ID: 587672 | Published 5/24/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.