This posting has been archived
#588009
•
Posted 5/25/2021
Mid City, La Brea & SMB Pavement Repair Program, West Hollywood, CA
- Owner Reference
- CIP 2103
- Bid Date
- Jul 1, 2021 at 10:00AM
- Estimate
- $1,650,000
- Owner
- City of West Hollywood, CA
Description
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents. The general items of work include pavement preparation, cold milling, street resurfacing, pavement striping and markings, loop replacement, adjustment of manhole frame and utility covers to grade, and other items not mentioned that are required.The general location and limits of the work are: La Brea Ave between Fountain Ave. and Romaine St., Ogden Dr. between Fountain Ave. and Santa Monica Blvd., Orange Grove Ave. between Fountain Ave. and Santa Monica Blvd., Flores St. between Fountain Ave. and Santa Monica Blvd., Kings Rd. between Fountain Ave. and Santa Monica Blvd., Olive Dr. between Fountain Ave. and Santa Monica Blvd. La Cienega Blvd between Holloway Dr. and southern City Limit, Holloway Dr. between La Cienega Blvd. and Santa Monica Blvd., West Knoll Dr. between Hancock Ave. and Westmount Dr., Hancock Ave. between Holloway Dr. and Santa Monica Blvd.
Huntley Dr. Between Santa Monica Blvd. and Melrose Ave. Santa Monica Blvd. at intersections La Brea Ave., Fairfax Ave, and La Cienega Blvd. Santa Monica Blvd. various locations between Hayworth Ave and Genesee Ave, Westbourne Dr and Hancock Ave. Bonds required. Prevailing wages. Completion time is 35 working days. Q&A due y 06/17/21 at 5PM.
Contact
- Mila Sologub
- (323) 848-6338
- [email protected]
CBS ID: 588009 | Published 5/25/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.