This posting has been archived
#588107
•
Posted 5/26/2021
Swan Creek Connector Trail, Toledo OH
- Bid Date
- Jul 2, 2021 at 12:00pm
- Owner
- Metropolitan Park District, Toledo Area OH
Description
Scope consists of construction of a 10 foot wide shared use path through Swan Creek Preserve Metropark. The new 10 foot wide path will consist of approximately 2,100 feet of aggregate path, 5,600 feet of asphalt, 580 feet of box beam boardwalk plus overlook, 2 steel truss bridges over Swan Creek, piling foundations with concrete caps, and concrete abutments. General construction includes clearing and grubbing; erosion control; storm drainage; aggregate and asphalt pavement; segmental retaining wall; concrete abutments and pier caps; steel pilings; steel truss bridges with concrete deck; box beams with concrete topping; railings.
DBE goal 9%. Bonds, insurance & prevailing wages apply.
Contact
- Jon Zvanovec
- (419) 360-9184
- [email protected]
CBS ID: 588107 | Published 5/26/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.