Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#588350 Posted 5/27/2021

Pump Station M Rehabilitation and Force Main Investigation, San Leandro, CA

Owner Reference
SD398
Bid Date
Jul 14, 2021 at 01:30PM
Pre-Bid
Strongly Encouraged - 6/10/2021 @ 09:00am @ (for location please or )
Estimate
$5.500,000 - $6,100,000
Owner
East Bay Municipal Utility District (EMUD) CA

Description

This project consists of the rehabilitation of Pump Station M and site utility exploratory work near the Force Main M pipeline at the San Leandro Channel Crossing as indicated in the drawings and per specifications. Work generally includes selected demolition of existing facility structures and equipment; modifications to the below-grade concrete structure; rehabilitation of concrete wall surfaces and coating; replacement of wooden building walls and roof; addition of a lavatory; replacement of wastewater pumps and piping, valves, pump controls equipment, electrical equipment, cathodic protection, odor control, backup generator, and HVAC system; installation and operations of temporary wastewater pumps and odor control equipment during pump station bypass. Work also includes improvements to City of Alameda sidewalks, crosswalks, traffic signal and electrical utility. Coordination with the City for permits and acceptance of this work will be required. Bonds, Prevailing Wages. 793 calendar days duration.

Contact

CBS ID: 588350 | Published 5/27/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.