This posting has been archived
#588535
•
Posted 5/29/2021
Tule River/Success Lake Spillway Enlargement Phase 2, Porterville , CA
- Owner Reference
- W91238-21-B-0010
- Bid Date
- Jun 25, 2021 at 11:00am
- Estimate
- $25.0M - $100.0M
- Owner
- US Department of the Army (Sac-USACE)
Description
NAICS Code: 237990 - Other Heavy and Civil Engineering Construction This project consists of constructing a 10 foot high 350 foot long curved reinforced concrete Ogee weir across Success lake spillway and constructing side walls and downstream Apron. The work will include widening of the spillway, excavating the Ogee weir and Apron foundation and weir slope embedment using blasting and/or excavation, and installation of rock anchors. Additional project improvements include construction of trench drains at the main dam left abutments, flood proofing of existing recreation facilities, and raising and relocation of existing wells and storage tanks. Rock slope protection will be added to Frazier Dike and other areas around the lake.
Bonds & prevailing wages apply
Contact
- Vernon Simpkins
- (916) 557-5234
- [email protected]
CBS ID: 588535 | Published 5/29/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.