PGBT Eastbound Alma Rd Exit Ramp Shoulder Reconstruction, Collin Co., TX
- Owner Reference
- B2100000506
- Bid Date
- Jun 17, 2021 at 11:00AM
- Pre-Bid
- Scheduled - 6/8/2021 @ 02:00PM @ (for location please or )
- Owner
- North Texas Tollway Authority TX
Description
Remove existing 6 wide asphalt pavement shoulder and replace with 6 wide, 13 reinforced concrete pavement with flexible base subgrade. Work includes cutting/plugging an existing 18 storm sewer pipe and inlet, regrading the existing side slope and densifying the soil as needed, replacing bridge end rail, installing new MBGF and constructing mow strips. Work also includes removing and installing an illumination drill shaft, reinstalling an existing stockpiled illumination pole and placing new conduit runs and conductor wires.
Contract term is 3 years. Bonds required. Prevailing wages apply. D/M/WBE Goal: 18%
Contact
- Reginald Valentine
- (214) 224-6840
- [email protected]
CBS ID: 588539 | Published 5/29/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.