Well 3 and Well 2 Generators, Horsham, PA
- Owner Reference
- 21-2
- Bid Date
- Jun 17, 2021 at 10:30AM
- Owner
- Horsham Water and Sewer Authority, Horsham PA
Description
The work for this project consists of the construction of two standby power systems, one at Well 2 and one at Well 22, in the Township of Horsham, Montgomery County, PA. Both proposed power systems will include the installation of 3-phase 480 Volt electrical power, a new automatic power transfer switch gear, generator foundation with design, and an electrical cable connection to the existing PECO primary power center. All work is to be completed in strict accordance with the Drawings and Project Manual. Work is contained under one two-part lump sum contract. Bonds and Prevailing Wages. Questions will be received on PennBid™ only until June 10, 2021, 2020 at 5:00 P.M.
Contact
- Tyler Evans P.E.
- (610) 217-5888
- [email protected]
CBS ID: 588575 | Published 5/30/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.