This posting has been archived
#588593
•
Posted 5/30/2021
Northeast Anaheim Colony (Sabina) Neighborhood Improvement - Phase 3 (Area B), Anaheim, CA
- Owner Reference
- RCP#2020-17551
- Bid Date
- Jun 17, 2021 at 11:00AM
- Pre-Bid
- Scheduled - 6/3/2021 @ 02:00PM @ (for location please or )
- Estimate
- $4,772,334
- Owner
- City of Anaheim, Public Works, CA
Description
The work to be done consists of, but not limited to rehabilitating the roadway by removing and reconstructing asphalt concrete, sidewalks, access ramps, driveway approaches, curb & gutters, pavement markings, repainting curbs, water line main replacement, and all appurtenant work. Bonds required. Prevailing wages. Q&A due by 06/10/21 at 11:55PM.In order to qualify for award of the Contract, it is required that the Contractor or appropriate subcontractor performing the water pipeline work shall have been engaged in the construction of a minimum of five (5) similar potable water pipeline projects within the last five (5) years, containing 6-inch diameter or larger ductile iron pipe, located in the public right-of-way, and constructed for a public agency.
Contact
- Stephen Cruz
- (714) 765-5100
- [email protected]
CBS ID: 588593 | Published 5/30/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.