This posting has been archived
#588596
•
Posted 5/30/2021
Sharon Park Walkways Reconstruction Project, Menlo Park, CA
- Owner Reference
- 2021-052821
- Bid Date
- Jun 16, 2021 at 01:30PM
- Pre-Bid
- Scheduled - 6/7/2021 @ 10:00am @ (for location please or )
- Estimate
- $450,000
- Owner
- City of Menlo Park, CA
Description
The work to be performed consists of milling 310 cubic yards of varying width and thickness of Asphalt Concrete (AC) walkways, perform 550 square feet of root/subgrade repair, removal and installation of 280 cubic yards of base reconstruction, overlay 265 tons 3-inch thick of ½-inch AC, overlay 175 tons 2-inch thick of 3/8-inch AC, removal and new installation of approximately 2,230 linear feet of header board and 1,925 linear feet of bender board, removal of concrete curb and gutter and installation of new concrete curb and gutter, retrofit and build an American with Disabilities Act (ADA) compliant asphalt parking stall, install new bollards, and other related work within the City’s Sharon Park area. Bonds required. Prevailing wages. Completion time is 25 working days.
Contact
- Rodolfo Ordonez
- (650) 330-6761
- [email protected]
CBS ID: 588596 | Published 5/30/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.