Replacement of Livonia Center Rd Culvert over Kinney Creek, Livonia, NY
- Owner Reference
- D036157
- Bid Date
- Jun 22, 2021 at 01:00pm
- Owner
- County of Livingston NY
Description
The work will include, but not be limited to, removal of the existing twin corrugated steel pipes, replacement with a precast 4-sided concrete box culvert. The wingwalls will be cast-in-place on spread footings. There will be full depth pavement reconstruction within the limits of the project. The Contractor shall have a maximum of eighty (80) consecutive calendar days from the date Notice to Proceed is issued to complete the project and before November 12, 2021 if the project is to be completed in 2021, or before July 29, 2022 if the project is to be completed in 2022. MBE goal is 8% and WBE goal is 4%. Bonds and prevailing wages
Contact
- Chris Bayer
- (585) 295-6294
- [email protected]
CBS ID: 588630 | Published 5/30/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.