This posting has been archived
#588740
•
Posted 5/31/2021
Donald C Tillman Water Reclamation Plant Influent & Effluent Flow Monitoring Infrastructure Re-Bid, Los Angeles, CA
- Owner Reference
- 200218 / SZD11297
- Bid Date
- Jul 21, 2021 at 01:00pm
- Pre-Bid
- Scheduled - 6/3/2021 @ 01:00PM @ (for location please or )
- Estimate
- $1,621,000.00
- Owner
- City of Los Angeles, Public Works, CA
Description
At DCTWRP Construct 4 MHs to provide access to flow monitoring equipment (under separate contract). Install instrument cabinets, pull-boxes, conduit, power & instrumentation signal lines for equipment in these MHs & 1 other Connect it to & provide PLC programming to integrate it into plant's Distributed Control System. Also some fencing, landscape & AC & permeable paving Inspect and report on existing conditions and submit report w/professional color images & digital video Note: limitations on hours for access & some types of work See bid package for full scope & details. Bonds required. 8% Prevailing wages apply. Local Business Preference Program applies. Outreach is due by July 7th @ 03:00. DBE Goals: MBE: 4%; WBE: 2%; SBE: 25%; EBE: 8%; DVBE: 3%
Contact
- Ibrahim Hafeez
- (213) 847-0100
- [email protected]
CBS ID: 588740 | Published 5/31/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.