Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#588860 Posted 6/1/2021

KBH Source Water Augmentation Parallel Pipeline, El Paso, TX

Owner Reference
46-21
Bid Date
Jun 25, 2021 at 01:50PM
Pre-Bid
Encouraged - 6/11/2021 @ 10:00am @ (for location please or )
Estimate
$6,080,857-$6,925,421
Owner
City of El Paso Water Utilities, TX

Description

The work under this contract shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following work: 1. Mobilization/Demobilization, General Requirements, Bonds, and Insurance 2. Water Approved Pipeline (12-inch, 16-inch, 20-inch, and 24-inch), valves, and inclusive of all appurtenances. 3. Steel casing (30-inch and 42-inch) using the boring method 4. Site Work (clearing and grubbing, grading, excavation, filling and hauling, fencing, access gates, drainage structures, HMAC/concrete paving etc.) 5. Well site concrete 6. Pipeline and valve equipment 7. Electrical and communication facilities 8. Process Instrumentation and Control System. Bonds required. Prevailing wages. SBE 25%, MBE 10% and WBE 7% goals.

Contact

  • Purchasing Dept.
  • (915) 594-5628

CBS ID: 588860 | Published 6/1/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.