This posting has been archived
#588860
•
Posted 6/1/2021
KBH Source Water Augmentation Parallel Pipeline, El Paso, TX
- Owner Reference
- 46-21
- Bid Date
- Jun 25, 2021 at 01:50PM
- Pre-Bid
- Encouraged - 6/11/2021 @ 10:00am @ (for location please or )
- Estimate
- $6,080,857-$6,925,421
- Owner
- City of El Paso Water Utilities, TX
Description
The work under this contract shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following work: 1. Mobilization/Demobilization, General Requirements, Bonds, and Insurance
2. Water Approved Pipeline (12-inch, 16-inch, 20-inch, and 24-inch), valves, and inclusive of all appurtenances. 3. Steel casing (30-inch and 42-inch) using the boring method 4. Site Work (clearing and grubbing, grading, excavation, filling and hauling, fencing, access gates, drainage structures, HMAC/concrete paving etc.) 5. Well site concrete 6. Pipeline and valve equipment 7. Electrical and communication facilities
8. Process Instrumentation and Control System. Bonds required. Prevailing wages. SBE 25%, MBE 10% and WBE 7% goals.
Contact
- Purchasing Dept.
- (915) 594-5628
CBS ID: 588860 | Published 6/1/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.