This posting has been archived
#588912
•
Posted 6/1/2021
Equipment at Water Well Commission 22A, Long Beach, CA
- Owner Reference
- WD-31-19
- Bid Date
- Jul 13, 2021 at 10:00AM
- Pre-Bid
- Mandatory - 6/22/2021 @ 10:00am @ (for location please or )
- Owner
- City of Long Beach, Water Commissioners, CA
Description
The work consists of demolishing the existing Well Commission 22 site. Demolition work includes, but is not limited to, demolishing of the electrical systems, the existing CMU structure, and existing above and below grade piping. The Work also requires the equipping of Well Commission 22A. Development of the Well Commission 22A site includes, installation of new pumps and motors, and associated electrical work. The new Well Commission 22A will be enclosed in a CMU enclosure. Discharge piping for Well Commission 22A will be hot-tapped in to the existing 24” raw water collection main.The Work Site is located in the City of Long Beach, California. at the following address: Commission 22A: Located north of Wardlow Road, east of San Gabriel River Channel, south of Long Beach Police Academy, and west of 605 Freeway in El Dorado Park. Completion time is 300 calendar days. Bonds required. Prevailing wages.
Contact
- Rhondora Concepcion
- (562) 570-2329
- [email protected]
CBS ID: 588912 | Published 6/1/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.