This posting has been archived
#589085
•
Posted 6/2/2021
Coley Avenue & David Drive Waterline and Roadway Improvement Project, Escalon, CA
- Owner Reference
- RFP 2021-05
- Bid Date
- Jul 8, 2021 at 10:00AM
- Owner
- City Of Escalon
Description
The project consists of the abandonment of an existing 8” water line and the installation of a new PVC 8” water line within the Coley Avenue and David Drive roadways. The existing water services, meters, and boxes shall be removed and reinstalled throughout both sides of the roadways. The existing two roadways shall have a 2” asphalt grind over the entire width of the roadways. Various sidewalk and curb improvements shall be done on both Coley Avenue and David Drive to aid in ADA accessibility. Bonds required. Prevailing wages. Bidders must be prequalified. All Bidders must pre-register before the bid opening with the City of Escalon Community Development/Public Works Office (Jenny Thompson: [email protected]).
Contact
- Bill Kull
- (209) 847-8726
- [email protected]
CBS ID: 589085 | Published 6/2/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.