This posting has been archived
#589170
•
Posted 6/18/2021
Water Treatment Plant Construction, Blackstone, MA
- Bid Date
- Jul 14, 2021 at 02:00pm
- Pre-Bid
- Encouraged - 6/16/2021 @ 10:00am @ (for location please or )
- Estimate
- $7M
- Owner
- Town of Blackstone MA
Description
The scope of work includes construction of a water treatment facility which will utilize 3 greensand pressure filtration vessels to remove iron and manganese from the water from the existing groundwater wells. The facility will be located adjacent to the town’s existing Corrosion Control Facility (CCF) located at 53 Elm St, Blackstone, MA, 01504. The work also includes the renovations of the existing CCF including demolition of existing equipment and installation of new equipment, including improvements to existing systems. Bid alternates include work at remote well sites and upgrades to HVAC systems at the existing CCF. The required contract completion period will be the date specified below based on an anticipated “Notice to Proceed” date of September 1, 2021. Date of substantial completion is December 31, 2022 and final completion is April 30, 2023. General Contractor's category of certification Sewage and Water Treatment Plants. Sub bids will be received until June 30, 2021 at 2:00pm. Sub trades include Waterproofing, Damp proofing and Caulking, Painting, Plumbing, HVAC, Electrical, and Miscellaneous Metal. MBE goal is 4.2% and WBE goal is 4.5%. Bonds and prevailing wages
Contact
- Sandy Nadeau-Lemoine x102
- (508) 883-1500
- (508) 883-7043
- [email protected]
CBS ID: 589170 | Published 6/18/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.