Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#589308 Posted 6/6/2021

Demo & New Construction: Ladera Linda Community Center & Park Project Manger & Construction Manager, Rancho Palos Verdes, CA

Bid Date
Jul 6, 2021 at 04:30PM
Owner
City of Rancho Palos Verdes CA

Description

The City is requesting proposals from qualified consulting firms to serve as the project manager and construction manager for the Ladera Linda Community Center and Park project. The scope of services covers overall project management and construction management activities; whereas an architectural/engineering firm has been retained to develop design drawings and contract documents, and a separate solicitation will be issued for Construction Inspection services.The City Council-approved Ladera Linda Community Center and Park project, excluding the Minor Modification, involves the following: Demolition of five existing buildings (18,574 ft2 in gross area), parking, ancillary site improvements and landscaping; Construction of a new 6,790 ft2 single-story building (Community Center) with an overall building footprint of 13,720 ft2 (enclosed and covered areas) at an overall height of 16 feet – 6 ¼ inches; Construction of a 775 ft2 outdoor tiered seating area; Construction of a 54-stall parking lot located adjacent to building and playground, including four clean air vehicle spaces; Construction of a naturalistic children’s playground area in the upper tier; Construction of one full basketball court and a half-court basketball court in the upper tier; Renovation of two existing paddle tennis courts in the upper tier; Construction of a 400 ft2 storage facility at 12 feet in height for City and emergency supplies; Construction of walking paths throughout park area along with upper and lower lawn areas; Construction of a lawn area in the lower tier; Utilization of existing driveway off Forrestal Drive as the only vehicular entrance into the park; Installation of low-impact, native and drought-tolerant landscaping, including 30- foot to 100-foot buffer zone between the building and southerly slope; 9,000 cubic yards combined balanced on-site grading (4,500 cubic yards of cut and 4,500 cubic yards of fill); Grading cut and fill over 5 feet in height to support an Americans with Disability Act (ADA) access ramp between middle- and upper-tiers; Construction of retaining and combination walls to a maximum height of 15 ½ feet to accommodate accessibility and ADA compliant ramps; Installation of a new 12-foot flagpole; Construction of mechanical equipment and refuse storage area; Installation of new bike and storage area; Installation of vehicular entry gate for park security; and, Installation of on-site lighting. Q&A due by 06/18/21.

Contact

CBS ID: 589308 | Published 6/6/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.