This posting has been archived
#589349
•
Posted 6/5/2021
Carmichael Windows Replacement, Sierra Vista, AZ
- Owner Reference
- #0721-CMWIN-01
- Bid Date
- Jun 29, 2021 at 11:00am
- Pre-Bid
- Encouraged - 6/10/2021 @ 10:00am @ (for location please or )
- Owner
- Sierra Vista School District, AZ
Description
Remove existing steel sash and Alum. XO windows from existing hollow metal sub frames. This will require grinding off welds on steel sash window connections to sub-frames and unscrewing and removing existing XO units. Fixed window glazing install will consist of installing new window stops to the interior and exterior side of the Hollow Metal sub-frames and installing 1" tempered insulated units with Guardian high performance Low-E glass AE " Sun Guard SNX 51/23 units. New XO windows units shall be Anderson 100 series fibrex tempered XO units screwed to the sub-frames, one in each classroom. According to Special Instructions, Terms, & Conditions Item No. 30 - use of a brand name is used to establish the general quality level desired. You will also install 39 each. new 1 W' X 4" X 50 3/8" long 1/8" steel tube welded to existing sub-frames for glazing supports. This tube steel will also require primer and finish paint, matching existing color. Furnish and install all sealants and glazing per HMMA for a watertight installation. Properly dispose of all demolished materials, daily clean-up required. Furnish 2 year warrant for all work. Bonds
Contact
- Phoebe Scalf
- (520) 515-2735
- [email protected]
CBS ID: 589349 | Published 6/5/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.