#589357 Posted 6/5/2021

Presolicitation Replace Switchgear at the Booster Fabrication Facility, Kennedy Space Center, FL

Owner Reference
80KSC021R0028
Bid Date
Jun 20, 2021 at 04:30pm
Estimate
$5,000,000 - $10,000,000
Owner
John F. Kennedy Space Center, NASA, FL

Description

Total Small Business Set-Aside. NAICS Code: 237130 - Power and Communication Line and Related Structures Construction, The work includes, but is not limited to, the following: Removal existing electrical equipment and Installation of new substations (switchgear/transformers/medium voltage switches), including installation of PLCs at locations inside the new substation, installation of PLC control and power wiring, installation of sensing devices, and connection to PLCs for the circuit. Existing equipment, components, assemblies, etc., that must be removed and replaced/reinstalled are known to have coatings containing or are partially comprised of asbestos, heavy metals, and/or PCBs. Abatement procedures will be required for certain construction activities. Bonds & prevailing wages apply

Contact

CBS ID: 589357 | Published 6/5/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.