This posting has been archived
#589489
•
Posted 6/7/2021
Parking Lot & Drainage Improvements Project, Myrtle Creek, OR
- Bid Date
- Jun 22, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 6/10/2021 @ 01:30PM @ (for location please or )
- Estimate
- $1,400,000-$1,510,000
- Owner
- South Umpqua School District (SUSD)
Description
The project consists of the following major items of construction: Construct new parking lot improvements, including demolition of majority of asphalt concrete, curb islands, existing water service pipelines and fire hydrants, storm drainage pipe and catch basins, light poles and bases, curb, sidewalk and curb. Provide new base construction, aggregate base, asphalt concrete pavement, construction of a new access road, concrete sidewalk, standard curb, curb and gutter, concrete valley gutter, catch basins, pavement markings, lighting, striping, signage and miscellaneous items, including ADA compliant parking. Construct surfacing and access infrastructure around a recently constructed Practice Facility, including new sidewalk, access ramps, parking, curb and handrail. Construct new water and storm drainage infrastructure, including new waterlines, valve vaults, irrigation piping and valve boxes, reinstatement of existing water service, pressure reducing valve assembly, fire hydrants, backflow assembly. Bonds Required. Prevailing Wages.
Contact
- Joseph Motta
- (541) 863-3115
CBS ID: 589489 | Published 6/7/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.