Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#589501 Posted 6/7/2021

W. Kern Ave Reconstruction & 6th St Overlay, McFarland, CA

Bid Date
Jul 1, 2021 at 02:00pm
Pre-Bid
Scheduled - 6/15/2021 @ 10:00am @ (for location please or )
Owner
City of McFarland, CA

Description

The work to be done consists in general of, but is not limited to, road reconstruction/overlay: cold plane, installing hot mix asphalt over aggregate base; installing traffic stripes, pavement markings, and roadside signs; reconstruct concrete ramps. Other items or details, not mentioned above, that are required by the typical sections, Standard Specifications or the special provisions shall be performed, placed, constructed or installed. Project completion time is 30 working days. Technical questions should be directed to BHT Engineering, Inc., (Contact: Juan M. Pantoja, (661) 558-4641 or [email protected]). Bonds required. Prevailing wages apply.

Contact

CBS ID: 589501 | Published 6/7/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.